boring tower
常见例句
- The boring tower is arranged on the unilateral cantilever survey platform.
钻塔,设于单侧悬臂勘探平台 上;
ip.com - Owing to the change of operating condition and serious water bearing in crude oil, the top of atmospheric tower is corroded and boring.
因操作条件变化和原油带水严重,造成常压塔顶部塔壁腐蚀穿孔。 - The equipment, comprising the boring tower inside the working area cantilever side and the slurry pumps on the boat body, is arranged on the survey platform.
设备,设于勘探平台上,包括位于工作区悬臂侧内的钻机和位于船体上的泥浆泵。
ip.com 返回 boring tower